Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 20 results ...

Al-Mhdawi, M K S (2022) Risk management of construction projects under extreme conditions: a case study of Iraq, Unpublished PhD Thesis, , University of Southampton.

Al-Sasi, B O (2007) A lean approach to capacity management in construction, Unpublished PhD Thesis, , University of Southampton.

Alfadhli, A (2013) Does the alternative dispute resolution have a role to play in the construction industry in the State of Kuwait?: look into the most appropriate methodology that may be taken in Kuwait in comparison with what are available in the English legal system, Unpublished PhD Thesis, Law School , University of Southampton.

Almeile, A M (2021) The role of political and economic stability on the success of public-private partnership (PPP) construction projects from a project management perspective, Unpublished PhD Thesis, , University of Southampton.

  • Type: Thesis
  • Keywords: construction project; government; partnership; public-private partnership; failure; Saudi Arabia
  • ISBN/ISSN:
  • URL: https://eprints.soton.ac.uk/452380/
  • Abstract:
    Public-private partnerships (PPP) is an efficient approach for procuring construction projects. Although many governments have implemented PPP construction projects in their countries, not all projects have been successful. Among the main reasons for the failure of these projects are the political and/or economic decisions in the host country, which may prevent the achievement of the PPP parties’ business goals. However, research is yet to fully consider this issue. Therefore, this thesis focuses on understanding the impact of political and economic stability on the success of PPP construction projects. To address the aim of this thesis, two theoretical studies and one empirical study in Saudi Arabia were conducted. In the first study, the literature on PPP construction projects undertaken between 1997 to 2021 was systematically reviewed. The review identified the key challenges facing PPP construction projects that were negatively affected by a lack of political and economic stability. By synthesising the totality of the evidence from the literature and highlighting the critical challenges of PPP construction projects, it was concluded that political and economic stability created many challenges for successfully implementing PPP construction projects. To understand the thesis aim further, the second study focused on identifying the impact of political and economic stability on the success of PPP construction projects by studying the factors leading to their success, namely the Critical Success Factors (CSFs), during the PPP project life cycle. A systematic review of literature on the CSFs for PPP construction projects between 1997 to 2021 was conducted. The identified CSFs were mapped according to the best-fit phases in the PPP project life cycle. This study concluded that political and economic stability, or a lack thereof, may well moderate the association between the CSFs and a PPP construction project’s success. To validate the previous study's findings, study three aimed to examine the moderating impact of political and economic stability on the association between CSFs and the success of a PPP construction project in Saudi Arabia. A conceptual model was developed representing the relationship between CSFs, the success of PPP construction projects and political and economic stability. The model was fed by questionnaire data from practitioners of PPP construction projects in Saudi Arabia. The statistical analysis, which was conducted using a structural equation model, revealed significant evidence of the moderating impact of economic stability on PPP construction project success in Saudi Arabia.

Baker, T O (2021) An investigation into pricing anomalies and the influence of information processing constraints on forecasts derived from sports betting markets, Unpublished PhD Thesis, , University of Southampton.

Bakhoum, E S H (2011) A decision support system for evaluation and selection of structural materials on a sustainability basis, Unpublished PhD Thesis, Civil Engineering, University of Southampton.

Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal, Unpublished PhD Thesis, , University of Southampton.

Brown, D C (2003) A methodology for selecting the construction team, Unpublished PhD Thesis, , University of Southampton.

Buckingham, H (2010) Accommodating change? An investigation of the impacts of government contracting processes on third sector providers of homelessness services in South East England, Unpublished PhD Thesis, School of Social Sciences , University of Southampton.

Curtis, B (1994) Roles, responsibilities and risks in management contracts, Unpublished PhD Thesis, , University of Southampton.

Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects, Unpublished PhD Thesis, , University of Southampton.

Fernandes, A G G (2014) Improving and embedding project management practice in organisations, Unpublished PhD Thesis, , University of Southampton.

Gul, S (2012) The role of conflict & negotiation in the complexity of projects, Unpublished PhD Thesis, , University of Southampton.

Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement, Unpublished PhD Thesis, School of Management , University of Southampton.

Jones, B K (1998) A model for collaborative engineering the construction industry, Unpublished PhD Thesis, , University of Southampton.

Ludlow, J E (1976) Assessment and prediction of noise from construction sites, Unpublished PhD Thesis, , University of Southampton.

Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor, Unpublished PhD Thesis, , University of Southampton.

Park, J (2011) Best-value in Korean public building construction, Unpublished PhD Thesis, School of Management , University of Southampton.

Rempelos, G (2023) A whole life carbon model for railway track system interventions, Unpublished PhD Thesis, , University of Southampton.

Riley, M J (2001) Re-engineering the construction procurement process, Unpublished PhD Thesis, , University of Southampton.